Preview

image preview

Photo Identifier

1982.01.0348.osize1

Creation Date

1959

Description and Location

1959-1960

Huntington Tri-State Airport with terminal under construction. Panoramic view showing construction in the foreground. The main terminal construction was begun in 1959 and completed in 1961. At that time, Eastern, Allegheny and Piedmont Airlines flew out of Tri-State.

Transportation Category

Airplanes & Airports

Media Format

Panoramic Photographic print

Keywords

Tri-State Airport, Walker Long Field, Air transportation

Share

 
COinS